Major Projects UndertakenOffering excellent service at all time.

1.Tobacco Processors Zimbabwe

a.Line one off season maintenance since November 2012 up to date

b.Weekend shutdown maintenance works. .

c.Manufacturing and repairing of Heat exchanger.

2.British American Tobacco, Harare, Zimbabwe

a.General Plant maintenance.

b.Manufacturing and assembling of the whole factory ducting system .

c.Various fabrication works in and outside the factory

3.Meridian Tobacco Company, Arua, Uganda

a. Upgrade of Green Leaf Threshing line form 2.5 t/hr to 5 t/hr. threshing line.

b. Design, Manufacture, installation and commissioning of new first stage components (Threshers, Classifiers, Separators, Shakers, Fans, Conveyors).

c. Upgrade of existing line (Dust collection system, conveyors and scrap reclaim).

d. General Plant maintenance, steam reticulation and hydraulic services.

4.House of Rag, Harare, Zimbabwe

a.Installation of cut rag classification and transport units.

b.Design, manufacture and installation of coal plant material handling system.

c.Manufacture and installation of boiler house condensate tank.

d.Installation and commissioning of dust plant unit.

e.Hydraulic services and General Plant Maintenance.

5.Savanna Tobacco

a. Design, Manufacture and Installation of cigarette warehouse humidifier system for Harare and Beira factory.

b. General plant maintenance.

6.Lafarge Cement Zimbabwe

a.Annual and routine shutdown maintenance works.

b.GML Station Bulk Loading Modification.

c.Cement Mill 2 Maintenance.

d.Kiln Tunnel routine maintenance..

e.Quarry Maintenance.

7.Zimtiles Zimbabwe

a.Installation and Commissioning of circulation fan and heater box for tiles curing system

b.Dust extraction system design, manufacture and installation.